Dongturbo offers EPC service of biomass and MSW power plant, hereafter mainly focus on the MSW power plant.
Send Inquiry
Chat Now
Product Introduction

Our company has now developed into a manufacturer of Wind Power Plant Equipment, Biomass And MSW Power Plant Diaphragm, Solar Power Plant Support Brackets with scientific management and mature technology. We warmly welcome your patronage and will serve our clients both at home and abroad with products and solutions of superior quality and excellent service geared to the trend of further development as always. We will always be realistic, innovative style to promote the overall appearance of the enterprise, so as to establish a better corporate image in the eyes of customers and partners. Our company has developed a set of independent and perfect product optimization design system after years of efforts.

Dongturbo offers EPC service of biomass and MSW power plant, hereafter mainly focus on the MSW power plant. On the MSW-To-Energy power plant, Dongturbo dedicate to provide clients with "one-stop" solution, involving wastes disposal, environmental pollution, social pressure, finance, etc..


1. Abilities and advantages

●The max. treatment capacity per boiler liner is 750 TPD, which runs stably, reliably and efficiently.

●Strong adaptability to MSW with high water contents, low heat value, and complex composition.

●High burning efficiency and lower clinker ignition loss.

●Adopt high-efficiency generator sets, which bring economic plant thermal efficiency.

●Adopt cleanly environmental technology, which make the pollutant emission concentration are lower than EU2000

●Plan rationally, design subtly, and build one-stop Garden layout MSW project.


2. EPC/Investment & Operation

9.1(001)


3. Solution of Waste to Energy

9.2(001)


4. Waste receiving and storage system

9.3(001)


5.MSW pre-treatment system

9.4(001)


6. MSW incineration system

9.5(001)


7. Mechanical grate boiler

9.6(001)


8. CFB incinerator of MSW

9.7(001)


9. Heat recovery system

9.8(001)


10. Flue gas treatment system

9.9(001)


11. Bottom ash handling system

10.1(001)


12. Fly ash handling system

10.2(001)


13. Leachate Treatment System

10.3(001)

10.4(001)


14. Odor control system

10.5(001)


15. General plant layout 

10.6(001)


16. Sample economy index

10.7(001)


17. Service upgrading

10.8(001)

Our Runh Power's Power Plant EPC Contractor Plus Financing Provider is constantly innovating, drawing on the best of others, and combining practical experience to complete a major innovation from product appearance to function. Since the establishment of the enterprise, our mission is to lead the industry's technical concepts and create excellent product quality. With the direction of building a sustainable society, our company is actively and continuously committed to caring for the global environment in all aspects of corporate activities.