Used Gas Turbine Saturn 20
video

Used Gas Turbine Saturn 20

We, Dongturbo, hereby would like make our best offer as follows for your target products. 1. Scope of supply The list below is SOLAR S20 gas turbine scope, which will be provided by seller. SOLAR S20 GAS TURBINE basic information 2. Price SOLAR S20 gas turbine price is as below 3. Delivery time...
Send Inquiry
Chat Now
Product Introduction

Dongturbo Electric Company Ltd is one of the leading manufacturers and suppliers of used gas turbine saturn 20 in China. We warmly welcome you to buy high quality customized products at competitive price from our factory. Contact us for more cheap products.

 

We, Dongturbo, hereby would like make our best offer as follows for your target products.
 
1. Scope of supply
The list below is SOLAR S20 gas turbine scope, which will be provided by seller.
SOLAR S20 GAS TURBINE
Item
Supply Scope
Qty.
1
Gas Turbine Power: 1214KW
Gun Turbine Speed: 22562 RPM
Control System Model: A-B PLC-5/20
Fuel Type: NATURAL GAS, OIL
Voltage: 380 V
Frequency: 50 Hz
Protection Level: IP 54
Weight: 14t
Dimensions L*W*H(M): 6000*1800 *2900
S20 Gas Turbine Generator Set Body: Including
Engine, Gearbox, Generator, Engine Base And
Engine Enclosure.
Fuel Regulation System: Shut-Off Valve, Regulating
Valve, Metering, Etc.
Lubrication And Cooling System: Lubricating Oil
Pump, Lubricating Oil Cooler, Oil Mist Separator
AC&DC System: AC MCC
Hood Ventilation System: Ventilation Filter, Ventilation
Fan, Silencer
CO2 Fire Extinguishing System: Detector, Alarm,
Control System, Pipeline, Etc.
Starting Device: Starting Motor
Control System: Unit Control Cabinet, Control System Software And Hardware
 
SOLAR S20 GAS TURBINE basic information
Engine
Solar S20 Gas Turbine

 

Fuel Nozzle
NG+DIESEL
Year of Manufacture
2007
Commissioning time
2009
Total Firing Hour
5008h/64h/308h
2. Price
SOLAR S20 gas turbine price is as below
Item
Description
Item scope
Unit Price(USD)
Qty(e.a)
Total
1
SOLAR S20 GASTURBINE
1
450,000.00
3
1,350,000.00
TOTAL FOB SHANGHAI AMOUNT IN USD
 
1,350,000.00
3. Delivery time
The products will be dispatched within 2 months after the contract signed and downpayment
received.
4. Payment terms
50% of contract amount shall be paid with 10 days after contract signed and issuing invoice.
50% of contract amount shall be paid after the receipt of the products readiness from Seller.
5. Quality assurance
Not available
6. Price validity
This offer will be validated for 10 days
Annex 1: S20 Gas Turbine Pictures

72a06013779aa32c18268e426e876aa2

70b8fbf37a946026acea2cd7745984be

3dd6d061e6e1f1f3fee8710538e75836

6e6358813001cf9702ab122ccc4f757f

Hot Tags: used gas turbine saturn 20, China, manufacturers, suppliers, factory, customized, buy, cheap, Components Refurbishment, Gas Turbine Air Intake System, Gas Turbine And Compressor, Gas Turbine Maintenance And Overhaul, Gas Turbine Refurbishment, Generator For Gas Turbine Power Plant

Send Inquiry

whatsapp

Phone

E-mail

Inquiry