Used Gas Turbine Saturn 20
We, Dongturbo, hereby would like make our best offer as follows for your target products. 1. Scope of supply The list below is SOLAR S20 gas turbine scope, which will be provided by seller. SOLAR S20 GAS TURBINE basic information 2. Price SOLAR S20 gas turbine price is as below 3. Delivery time...
Send Inquiry
Chat Now
Product Introduction
Dongturbo Electric Company Ltd is one of the leading manufacturers and suppliers of used gas turbine saturn 20 in China. We warmly welcome you to buy high quality customized products at competitive price from our factory. Contact us for more cheap products.
We, Dongturbo, hereby would like make our best offer as follows for your target products.
1. Scope of supply
The list below is SOLAR S20 gas turbine scope, which will be provided by seller.
|
SOLAR S20 GAS TURBINE
|
||
|
Item
|
Supply Scope
|
Qty.
|
|
1
|
Gas Turbine Power: 1214KW
Gun Turbine Speed: 22562 RPM
Control System Model: A-B PLC-5/20
Fuel Type: NATURAL GAS, OIL
Voltage: 380 V
Frequency: 50 Hz
Protection Level: IP 54
Weight: 14t
Dimensions L*W*H(M): 6000*1800 *2900
S20 Gas Turbine Generator Set Body: Including
Engine, Gearbox, Generator, Engine Base And
Engine Enclosure.
Fuel Regulation System: Shut-Off Valve, Regulating
Valve, Metering, Etc.
Lubrication And Cooling System: Lubricating Oil
Pump, Lubricating Oil Cooler, Oil Mist Separator
AC&DC System: AC MCC
Hood Ventilation System: Ventilation Filter, Ventilation
Fan, Silencer
CO2 Fire Extinguishing System: Detector, Alarm,
Control System, Pipeline, Etc.
Starting Device: Starting Motor
Control System: Unit Control Cabinet, Control System Software And Hardware
|
|
SOLAR S20 GAS TURBINE basic information
|
Engine
|
Solar S20 Gas Turbine
|
|
|
Fuel Nozzle
|
NG+DIESEL
|
|
|
Year of Manufacture
|
2007
|
|
|
Commissioning time
|
2009
|
|
|
Total Firing Hour
|
5008h/64h/308h
|
|
2. Price
SOLAR S20 gas turbine price is as below
|
Item
|
Description
|
Item scope
|
Unit Price(USD) |
Qty(e.a)
|
Total
|
|
1
|
SOLAR S20 GASTURBINE
|
1
|
450,000.00
|
3
|
1,350,000.00
|
|
TOTAL FOB SHANGHAI AMOUNT IN USD
|
1,350,000.00
|
||||
3. Delivery time
The products will be dispatched within 2 months after the contract signed and downpayment
received.
4. Payment terms
50% of contract amount shall be paid with 10 days after contract signed and issuing invoice.
50% of contract amount shall be paid after the receipt of the products readiness from Seller.
5. Quality assurance
Not available
6. Price validity
This offer will be validated for 10 days
Annex 1: S20 Gas Turbine Pictures




Hot Tags: used gas turbine saturn 20, China, manufacturers, suppliers, factory, customized, buy, cheap, Components Refurbishment, Gas Turbine Air Intake System, Gas Turbine And Compressor, Gas Turbine Maintenance And Overhaul, Gas Turbine Refurbishment, Generator For Gas Turbine Power Plant
Previous
Used Solar Gas Turbine T70You Might Also Like
Send Inquiry












