Modernization of Steam Turbines Rated 200 MW and 300 MW with the Aim of Increasing Output, Efficiency and Reliability
Send Inquiry
Chat Now
Product Introduction

Dongturbo Electric Company Ltd is one of the leading manufacturers and suppliers of steam turbine retrofits/modernization turbine solution in China. We warmly welcome you to buy high quality customized products at competitive price from our factory. Contact us for more cheap products.

 

1

Increase in turbine efficiency

1. Replacement of steam path with reactive blading with and without replacing of outer HP casing

2. Modernization of IP flow path LP

3. Replacement of springs in glands with cylindrical springs


Increase in turbine efficiency

1. Replacement of steam path with reactive blading with and without replacing of outer HP casing

2. Modernization of IP flow path LP

3. Replacement of springs in glands with cylindrical springs


Reduction of labour consumption for maintenance

1. Modernization of the monitoring system


Increase in power other technical characteristics

1. Controlled steam extraction for district heating


Reduction of capitalized expenses

1. Electro hydraulic protection against increase


2


 HPC internal efficiency increase -  5.0 - 8.0 %

 Efficiency increase -  5.0 %

 IPC internal efficiency increase-  1.5 - 3.0 %

 Output increase – 25 MW

  LPC internal efficiency increase -  9.0 - 12.0 %


Turbine K-200-130 (K-225-130), modernized HPC

_20210122112851

1. Increased number of stages

2. Increased height of blades, smaller diameter of flow path

3. New effective airfoils of stationary and moving blades adjusted with flow inlet angles

4. Reactive type blading (new airfoils) 

5. Decreased differential pressure at control stage 

6. Internal efficiency increase: 5.0 - 8.0%

_20210122113132

Single-sealing housing carrier design    ensures as follows:

1. exclusion of buckling,

2. exclusion of damages to the strips of the sealing rings,

3. insensibility of gland to the temperature fluctuations,

4. exclusion of steaming,

5. increase in reliability,

6. reduction of scope and time of assembling works,

7. decrease in radial clearance values by 30 – 40%.

The gland of a similar design has been installed in turbine K-255-162 at Alholma power station in Finland.

Output losses are reduced by 1000-1250 kW.


Turbine K-200-130 (K-225-130), modernized IPC

_20210122113629

 Integrally milled shrouds, welded diaphragms

 Adjusted flow angles and airfoil angles

 Smooth meridian contour

 Developed diaphragm seals

 New design of shroud seals

_20210122113834

Single-sealing housing carrier design ensures as follows:

1. exclusion of buckling,

2. exclusion of damages to the strips of the sealing rings,

3. insensibility of gland to the temperature fluctuations,

4. exclusion of steaming,

5. increase in reliability,

6. reduction of scope and time of assembling works,

7. decrease in radial clearance values by 30 – 40%.

The gland of a similar design has been installed in turbine K-255-162 at Alholma power station in Finland.

Output losses are reduced by 1000-1250 kW


Turbine K-200-130 (K-225-130), modernized LPC

_20210122114108

1. Damping wires are eliminated from steam flow path

2. New steam flow path using stationary blades with tangential lean and last stage moving blade of 960 mm

3. Integral milled shrouds, welded diaphragms

4. Adjusted flow angles and airfoil angles

5. Smooth meridian contour

6. Elimination of film moisture

7. Modernization of exhaust branch

8. Developed diaphragm seals

9. New design of shroud seals


Hot Tags: steam turbine retrofits/modernization turbine solution, China, manufacturers, suppliers, factory, customized, buy, cheap, EPC Of Coal Fired Power Plant, Power Plant Maintenance And Overhaul, Balance Of Plant Equipment Supply, Power Plant Retrofitting, Power Plant Turbine Blade, Power Plant Components And Parts

Send Inquiry

whatsapp

Phone

E-mail

Inquiry