5KW Educational Purpose Micro Condensing Steam Turbine
video

5KW Educational Purpose Micro Condensing Steam Turbine

5KW micro/mini condensing steam turbine is developed mainly for demstration of electricity generation process.Demonstrate the principle of how to convert steam into electricity in thermal power plants.
Send Inquiry
Chat Now
Product Introduction

Dongturbo Electric Company Ltd is one of the leading manufacturers and suppliers of 5kw educational purpose micro condensing steam turbine in China. We warmly welcome you to buy high quality customized products at competitive price from our factory. Contact us for more cheap products.

 

This product is not currently available for sale.

5KW micro/mini condensing steam turbine are mainly developed based on the educational purpose. 


The complete 5KW micro/mini condensing steam turbine gen set information is as follows:

1. Generation information

1.1 Turbine type■ Condensing steam turbine

ModelN0.005-1.3

 

1.2 Design working life: 30 years

 

1.3 Continuous working time not below 8000 hours.

 

1.4 Steam turbines should meet the power and speed requirements of generators under various operating conditions

1.5 Steam Turbine is Electronic Control.

 

1.6 Control system & protect system

 

Control type: electronic.

1.7 Turning GearBy hand

 

1.8 Instruments Supervisory & protect

Instruments Supervisory & protecting system includespeed meter, temperature

 

meter, pressure meter and so on.

 

1.9 Steam water system include: condensing pump, condenser

 

Main steam system: include main steam piping flange, inlet valve & by pass, regulating valve, trap and so on.

Condensate system: include condensate piping, condensate pump, valves for condensate piping.

1.10 Vacuum system

 

1.11 Gland system(include piping valve)

 

1.12 Drainage system(include piping valve)

 

1.13  Turbine lube system

 

2. Scope of supply

 

2.1 Supply cope include the parts from turbine inlet flange to condenser hot well(include hot well condensate pump), generator, control box..

2.2 The enduser need to supply the cooling water with temperature of 27-33, cooling water pump, inlet piping, valve, condensate recycle piping& valve, wire connecting control box and generator, connecting wire to low pressure switch.

3. Inspection & testing

 

3.1 The following testing are made in plant

 

Casing water pressure test Balance test of rotor Overspeed test


3.2 the turbine will operate running test and load test on enduser site. Will offer test report when dispatch.


 

 

No.

Description

Paramters

Re-marks

1

Model

N0.005-1.3


2

Rated Power

5 KW


3

Rated Speed

1800r/min


4

Generator speed

1800r/min


5

Inlet pressure

1.3MPa

 

 

 

 

Inlet

 

Parameters

 

 6

 

 Inlet pressure

saturation temperature

7

Inlet steam

0.45t/h

8

Steam consumption

90.0kg/kw.h

 

9

exhaust pressure load

            0.01MPa


10

Condensate Temperature

46


11

Layout

Single layer


12

Rotor Structure

1C


 13

Connection between the turbine and generator

exhaust pressure


14

Noise db

≤ 80


15

Generator power

8K W


16

Generator  Voltage

220 V


17

Generator  Frequency

60HZ


18

Generator Speed

1800r/min



Hot Tags: 5kw educational purpose micro/mini condensing steam turbine, China, manufacturers, suppliers, factory, customized, buy, cheap, High Efficiency Steam Turbine, High Stability Generator, Advanced Boiler

Send Inquiry

whatsapp

Phone

E-mail

Inquiry