Refurbished Solar Gas Turbine Titan130

Refurbished Solar Gas Turbine Titan130

Refurbished Solar Gas Turbine Titan 130 & Mars 100 for sale
Send Inquiry
Chat Now
Product Introduction

Dongturbo Electric Company Ltd is one of the leading manufacturers and suppliers of refurbished solar gas turbine titan130 in China. We warmly welcome you to buy high quality customized products at competitive price from our factory. Contact us for more cheap products.

 

Refurbished 2 Sets of Titan 130 Gas Turbine for Sale


NO

TYPE

DATA

Unit weight and box   size

Condition

PRICE USD

FOB (SHANGHAI)

1

1# TITAN130

 

Voltage:6.5 KV 

Current:817AMP   

Power factor:0.8  

Frequency:50 Hz

Rated power:14.264MW;

Heat efficiency:3.43kw/Nm3

Generating efficiency:35.2%

 

Length:14.1M

Height:3.948M

Width:3.305M

Total weight:87tons

 

Service time:33063h

Manufacture time:April, 2007

Stop operation time:2017

 

2,080,000usd/set.

2

2 # TITAN130

 

Service time:35566h

Running time after overhaul:6150h

Manufacture time:Dec, 2007

Stop operation time:2017

3,500,000usd/set.

Equipment

SUPPLY   LIST:

TITAN130

 

Complete   set of cases, including:

1). Gas   generator, air system, starting system, fuel system, lubrication system, fire   protection system, electrical control system, gear box.

2).   Generator composition,

3)   Evaporative cooler for gas turbine power station.


Redurbished 3 Sets Solar Gas Turbine Mars100 in Stock for Sale


NO

TYPE

DATA

Unit weight and box   size

condition

PRICE USD

FOB (SHANGHAI)

1

1#MARS100

Gas turbine set

Generator parameters:

Voltage:10.5 KV

Current:687AMP

Power factor:0.8

Frequency:50 Hz

Rated power:10690KW

Heat rate:3.21kw/Nm3

Generating efficiency:32.9%

Length:13.86M 

Height:3.56M

Width:2.93M

Weight:62.48T

Manufacture time:2008

Stop operation time:2017

Service time:79194h

Running time after overhaul:17924h

1,800,000usd/set.

2

2#MARS100

 

Manufacture time:Aug, 2000

Stop operation time:2017

Service time:75580h

Running time after overhaul:12453h

1,800,000usd/set.

3

3#MARS100

 

Manufacture time:2000

Stop operation time:2017

Service time:68942

Running time after overhaul:3259

1,900,000usd/set.

Equipment

SUPPLY   LIST:

MARS100

 

Complete   set of cases, including:

1). Gas   generator, air system, starting system, fuel system, lubrication system, fire   protection system, electrical control system, gear box.

2).   Generator composition,

3)   evaporative cooler for gas turbine power station.



Hot Tags: Refurbished Solar Gas Turbine Titan130, China, manufacturers, suppliers, factory, customized, buy, cheap, Generator For Gas Turbine Power Plant, Components Refurbishment, Gas Turbine Air Intake System, Gas Turbine And Compressor

Send Inquiry

whatsapp

Phone

E-mail

Inquiry